Workout screen
One screen for the whole session
Warm-up ramp, working sets, superset partner and the rest timer, in the order you meet them. The rest keeps counting on the lock screen.
Unlock your full potential with intelligent tracking, personalized insights, an AI coach that thinks with you, and data-driven progress — because every rep counts.
Mon
October 192026
Welcome back, Mara.
You have 1 workout today.
Weekly recap from your AI Coach
NewOct 12 – Oct 18
Mara, you finished all four planned sessions. Volume held flat against last week at 17,710 kg. Keep the four in the calendar.
This week
12-week streak
1 / 3 workouts
M
19
T
20
W
21
T
22
F
23
S
24
S
25
Pull · Day 2
6 exercises · 20 sets · about 55 min
what it looks like before you sign up
Workout screen
Warm-up ramp, working sets, superset partner and the rest timer, in the order you meet them. The rest keeps counting on the lock screen.
AI Coach
Ask a question, get a proposal with the old and the new value side by side.
My bench has sat at 77.5 kg for three weeks.
Switch to 4 × 6 at 77.5 kg, target RPE 8 and 180 seconds of rest.
Apply this change?
Nothing changes until you confirm.
Numbers
Volume, records, streaks. Over the timeframe you pick.
Plans
Days, exercises, sets, supersets, deload weeks. Yours, a template, or the coach's draft.
Recaps
What you did, what changed, and where the numbers flattened out.
For trainers
Assign plans, read sessions and check-ins, answer in the same place. In the browser or on the iPhone.
Trainer plan. Example data.
Two platforms
Log on the phone, plan on the big screen. Neither waits for the other.
iOS app with the full scope, built for iPhone.
Web app in any browser, nothing to install.
Sets logged offline go out in order once you have signal.
a coach that changes the plan
Ask in plain sentences. When the answer means a concrete change — less load, a different exercise, one more set — the coach puts it next to the answer as a proposal: old value, new value. One tap applies it. Until then nothing happens, and afterwards the card says what changed.
built for the training you actually do
Supersets that send you back and forth between partners. Warm-up sets computed from your working weight. Plate maths in your own unit, effort on the scale you were taught. A set is logged the moment you tap, and the screen stays on. And when the signal dies in the basement, the sets go into a queue.
what moved, and by how much
Volume, estimated one-rep max, strength standards, muscle distribution, body weight, streaks, records. Pick a timeframe and the whole page follows it.
plans that keep up
Build one yourself, start from a template or let the coach draft it. With a deload week, a pause for the weeks that do not work out, and a library to pull from.
all of it, on your phone
Everything you do in lyftd fits in a pocket: plans, execution, statistics, your whole workout history, coach chat, recaps, check-ins and messages to your trainer. Trainers run their coaching from it too. And it keeps working when the gym has no reception.
The app comes with every lyftd account, the free one too. Until it is in the App Store it runs as a public beta on TestFlight, and sign-up happens on lyftd.app.
The lyftd community so far
0
workouts completed
0kg
total volume lifted
0
sets logged
you coach. lyftd keeps the records.
Roster, plans, check-ins, adherence and feedback in one workspace, in the browser and on the iPhone. You pay the subscription, your athletes train along on your seats: full feature set, no invoice of their own.
$39.00 per month, 5 athlete seats included. See the Trainer plan
≙ $32.77 net plus 19% VAT
Roster
Plan, week and last workout, per athlete.
Inbox
Workouts, check-ins, messages and missed days, newest first.
Compliance
Eight weeks of sessions done against planned, for the whole roster.
One athlete
Volume, records and adherence for the person in front of you.
Progress report
Key figures and intake answers, printable in your branding.
The trainer workspace in the browser. Example data.
Per athlete: active plan, done and planned this week, last workout, seat status. Plus eight weeks of adherence in one grid.
Keep programs in a library of their own and assign them to one athlete, or push a plan to a whole training group in one step.
A weekly check-in with body weight and five scales, a comment thread under every session, and a direct thread per athlete.
Done and planned per athlete, plus rising RPE or pain scores. Whoever fell behind is sorted to the top.
Free text, yes/no, scales and single or multiple choice for new athletes. The answers stay with the athlete and show up in their stats.
Key figures, adherence and intake answers per athlete, printable straight to PDF.
For training you plan yourself. Unlimited logging, one plan, 30 days of stats, ten coach questions a month. Free, no subscription.
14 days of Elite included, no credit card
Most Popular
For getting more out of your numbers. The coach without a limit, the plan generator, automatic progression, full stats and no limits on plans and exercises.
per month
14 days of Elite included, no credit card
For everyone who coaches other people. Everything in Elite, plus an athlete roster, weekly check-ins, plan assignment, a Monday adherence email and a progress report in your branding. In the browser and on the iPhone.
per month
≙ $32.77 net plus 19% VAT
Frequently Asked Questions